Long-delayed replacement of a facility with asbestos, unsafe electrical systems, and other deficiencies involves significant capital costs and public outreach to secure support for FY2027 ballot funding.

Overview

The South Fire Station Reconstruction Project addresses long-standing safety and compliance shortfalls at the 1974 facility. Briefings at the Town Council in June 2026 and MBAC in July 2026 established the need for reconstruction, introduced cost-control measures, and initiated public outreach ahead of potential FY2027 ballot action.

Background

The South Fire Station Reconstruction Project emerged from documented structural and operational deficiencies at the facility originally built in 1974. On June 1, 2026, the Town Council received a formal briefing from MBAC Chair Nicole McGee outlining unsafe electrical systems, asbestos concerns, lack of ADA compliance, undersized apparatus bays, and inadequate space for modern decontamination and gender-specific facilities. The presentation framed reconstruction as necessary to advance the project onto the FY2027 ballot.

Following that briefing, the Municipal Budget Advisory Committee took up the project on July 9, 2026, reviewing schematic designs estimated at $7.45 million against a $7.1 million hard-cost target within a $10 million not-to-exceed budget. Value-engineering measures such as brick cladding, removal of skylights, and revised canopy and door designs were discussed to control costs while preserving functionality.

Design revisions also shifted the exterior to a more traditional style to better integrate with the surrounding residential neighborhood. Chief Lemire reported ongoing consultant meetings that informed these changes, emphasizing that new construction would ultimately cost less than renovation.

Public outreach strategies were developed in the same July 9 session, including social media campaigns to illustrate building deficiencies, presentations to the senior center, and engagement with groups such as Rotary and Kiwanis. The committee proposed forming subcommittees modeled on the earlier police station project to coordinate finance, communications, and stakeholder input from boards including Planning, Zoning, and Historic District.

The project carries significant stakes for public safety infrastructure and taxpayer costs, requiring simultaneous upgrades to meet current codes and containment of overall expenditure. No formal votes on funding or construction have occurred to date; the Council and MBAC have treated the sessions as informational briefings to prepare for future ballot consideration.

As of the most recent evidence, the initiative remains in the schematic design and community-engagement phase, with plans to return updated designs to the Town Council for further review.

How it unfolded
MBAC Chair Nicole McGee briefed the Council on severe deficiencies at the 1974 South Fire Station including unsafe electrical systems, asbestos, ADA noncompliance, and inadequate space, positioning the project for the FY2027 ballot.
2026-06-01Town Council
The committee reviewed schematic designs at $7.45 million against a $7.1 million target within a $10 million budget, discussed value-engineering options and neighborhood-compatible design revisions, and outlined public outreach and subcommittee structures to build support.
2026-07-09Mbac
Arguments in favor
The 1974 station has unsafe electrical systems, asbestos concerns, lacks ADA compliance, has undersized apparatus bays, and insufficient space for modern decontamination and gender-specific facilities.
town-council 2026-06-01
For
Renovation would be more costly than new construction while still failing to meet current operational needs.
town-council 2026-06-01
For
Value engineering and design adjustments can keep the project within the $10 million not-to-exceed budget while improving neighborhood fit.
mbac 2026-07-09
For
Key voices
“detailed significant deficiencies in the 1974 station, including unsafe electrical systems, asbestos concerns, lack of ADA compliance, undersized apparatus bays, and insufficient space for modern decontamination and gender-specific facilities”
Nicole McGee (MBAC Chair)town-council 2026-06-01
“the exterior design was reverted to a more traditional style to better match the residential neighborhood”
Chief Lemirembac 2026-07-09
What's next

The committee will review schematic designs once available and present the project to the Town Council; subcommittees will be formed for finance and communications.